New St. Ignace Mackinac Bridge Walk starting location announced for 2024 ST. IGNACE, Mich. – For the safety and convenience of participants who start from the St. Ignace side for the 2024 Mackinac Bridge Walk, the walk will begin from Bridge View Park on the west side of I-75 rather than at the Mackinac Bridge Authority (MBA) administration building. As most participants who start in St. Ignace already park at Bridge View Park, starting the walk from that side reduces the number of people crossing the interstate before the event begins. Participants who park on the east side of I-75 will now be guided across the road before and after walking the bridge. “Far more parking is available in Bridge View Park and there is also more room for gathering before the start of the event,” said MBA Bridge Director Kim Nowack. “Starting the walk from that side of I-75 will be more convenient and safer for most participants.” Based on the success of the recent events, the MBA will again start the 2024 Bridge Walk from both St. Ignace and Mackinaw City, which eliminates the need for busing and offers additional options for participants. A video, posted on the MBA website at www.MackinacBridge.org/Walk, explains the bridge walk schedule and the choices people have whether they start from the north or south end of the bridge. Walkers essentially have three main options, outlined in the video:
As for the last several years, because walkers can start from either end of the bridge when they arrive, there will be no buses transporting participants across the bridge. Participants must plan accordingly to ensure they end their walk on the same side of the bridge as their transportation. The MBA does not provide any shuttle service after the walk and cannot guarantee outside shuttle services will be offered. The bridge will again be closed to public traffic during the 2024 walk, from 6:30 a.m. to noon on Labor Day, Sept. 2, based on recommendations from the Michigan State Police and U.S. Department of Homeland Security. Emergency vehicles will still be permitted to cross the bridge, but no public vehicles until the walk concludes and participants are off the bridge. The bridge walk has been an annual event since 1958, with the exception of 2020. The 2024 walk will be the 66th event. Between 20,000 and 35,000 people have participated in recent years; 35,000 participated in the 2023 event. |