MDOT E-mail

MDOT on facebook MDOT on Twitter MDOT on YouTube Mi Drive - Know before you go. MDOT on Instagram Sign up for E-mails form MDOT
Having trouble viewing this email? View it as a Web page.

Bookmark and Share

The following work is scheduled to begin Monday, July 7. Check for the latest information on Michigan.gov/drive and follow on X @MDOT_MetroDet. Work is weather dependent.

I-696/I-94:

In Macomb County, the right lane on the two-lane ramp from eastbound I-696 to eastbound I-94 will close at 9 a.m. Monday until mid-August for pump station rehabilitation. In addition, the ramp from 11 Mile Road to eastbound I-94 will close.

I-94:

In Macomb County, bridge maintenance and inspections will result in the following restrictions:

On Monday, the right lane of westbound I-94 at 21 Mile Road, and the 21 Mile Road entrance ramp, will be closed from 9 a.m. – 11 a.m.

On Monday, double lane closures on westbound I-94 at Frazho Road from 9 a.m. – 12 p.m.

On Monday and Tuesday, two left lanes of westbound I-94 at Henry B. Joy Road from 12p.m. – 2p.m. (Monday) and 9 a.m. – 11 a.m. (Tuesday).

On Tuesday, the left lane of eastbound I-94 at Cotton Road from 9 a.m. – 11 a.m.

I-696:

In Oakland County, the Santa Barbara Drive overpass (east of Evergreen Road) above I-696 will close until late July with traffic directed to nearby crossover bridges.

US-24 (Telegraph Road):

In Wayne County, the right lane of northbound Telegraph Road will be closed from M-153 (Ford Road) to Warren Avenue for utility maintenance work.

M-1 (Woodward Avenue):

In Oakland County, alternating double left and right lane closures on northbound and southbound Woodward between Square Lake Road and Woodward Loop for pavement repair until late July.

Old M-14 (Ann Arbor Road):

In Wayne County, eastbound Ann Arbor Road will have a single lane closed from Lilley to Haggerty roads until fall for pump station rehabilitation work.

M-102 (Eight Mile Road):

In Detroit, the left lane of westbound Eight Mile Road at Van Dyke Avenue will be closed for permit work from 6 a.m. Monday until late August.